Facebook Twitter LinkedIn RSS
    Trending
    • Technology alone cannot build smart cities, says Agabi
    • Three big tests await Nvidia as Jensen Huang returns to leadership
    • NITDA picks 317 women for IgniteHER boot camp, targets startup funding
    • Nigerians embrace power bank, battery rentals amid unreliable electricity
    • NCC study targets fairer pricing, transparency in telecom VAS market
    • 90% of Nigerian startup founders rely on personal savings – Report
    • Moniepoint opens Abuja regional HQ to deepen financial inclusion, meet CBN requirements
    • Dangote, Otedola, four others lose ₦2.19trn as NGX sheds ₦3.35trn
    Facebook Twitter LinkedIn
    ITPulse.com.ngITPulse.com.ng
    • News
    • Interviews
    • Blogs
    • Analysis
    • Opinion
    • Videos
    • Press Releases
    • Pictures
    • Advertise
    ITPulse.com.ngITPulse.com.ng
    Home»News»Telecom: NCC highlights steps taken to support take-off of InfraCos
    News 2 Mins Read

    Telecom: NCC highlights steps taken to support take-off of InfraCos

    mmBy ITPulseOctober 18, 2020
    Facebook Twitter WhatsApp Pinterest LinkedIn Reddit Tumblr Email
    Laying of Fibre in a Nigerian Community
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Nigerian Communications Commission (NCC) has highlighted some steps it has taken so far to support the deployment of infrastructure in Nigeria by all the licensed Infrastructure Companies (InfraCo)

    In a statement signed by its Director of Public Affairs, Dr. Ikechukwu Adinde, the telecom regulator said it is reviewing the InfraCos framework and funding options. Thus, has constituted a committee recommend sustainable funding options for effective implementation of the proposed national fibre project.

    The setting up of the committee, according to the statement was sequel to the requirements of the new Nigerian National Broadband Plan (NNBP 2020-2025) and reports of relevant committees set up by the Federal Executive Council (FEC), which include the Inter-Ministerial Review Committee on Multiple Taxation on Telecommunications Operators over Right-of-Way (RoW) and the Technical Sub-Committee on Right-of-Way for Deepening Broadband Penetration in Nigeria.

    These requirements and reports relate to the imperative of reviewing the InfraCo framework to cater for the delays in take-off, change in exchange rate, supply chain and other challenges imposed by the COVID-19 pandemic.

    The statement disclosed that the committee has met with all the six licensed InfraCos as well as the preferred bidder for the North Central zone.

    “The Committee is also looking at the challenges facing the InfraCo project, the need for accelerated deployment of fibre infrastructure, means of mitigating the exorbitant RoW charges, among others.

    “The Commission is also working actively with the Broadband Implementation Steering Committee (BISC), as constituted by the Hon. Minister of Communications and Digital Economy based on the recommendations and requirements of the NNBP 2020-2025.

    “Providing updates on the status of the InfraCo project in his office in Abuja at the weekend, the Executive Vice Chairman of the Commission, Prof. Umar Garba Danbatta, said: “The InfraCo project is dear to the government because of its ability to enhance robust and pervasive broadband infrastructure to drive service availability, accessibility and affordability,” part of the statement reads.

    The statement also quoted the Executive Vice Chairman of the Commission, Prof. Umar Danbatta to have said the Commission is keen on ensuring the project delivers maximum benefits for the economy at large and that is why the ongoing review is very critical to the overall success of the project in line with the new realities of the time.

     

    Fiber deployment Infracos Telecom infrastructure
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    mm
    ITPulse
    • Website
    • Facebook
    • Twitter
    • LinkedIn

    ITPulse is a wholly information technology communication (ICT) news website, with a special focus on the African continent. The website provides up-to-date biz-tech news, analysis and comprehensive and thorough insight into the continent's ICT terrain

    Related Posts

    Technology alone cannot build smart cities, says Agabi

    November 24, 2026

    Three big tests await Nvidia as Jensen Huang returns to leadership

    November 24, 2026

    NITDA picks 317 women for IgniteHER boot camp, targets startup funding

    November 24, 2026

    Leave A Reply Cancel Reply

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Latest Posts

    Technology alone cannot build smart cities, says Agabi

    November 24, 2026

    Three big tests await Nvidia as Jensen Huang returns to leadership

    November 24, 2026

    NITDA picks 317 women for IgniteHER boot camp, targets startup funding

    November 24, 2026
    About
    About

    Itpulse.com.ng is a wholly information technology communication (ICT) news website, with special focus on the African continent. The website provides up-to-date biz-tech news, analysis and a comprehensive and thorough insight info the continent's ICT terrain.

    Contact us: editorial@itpulse.com.ng

    Facebook Twitter LinkedIn RSS
    Latest Posts

    Technology alone cannot build smart cities, says Agabi

    November 24, 2026

    Three big tests await Nvidia as Jensen Huang returns to leadership

    November 24, 2026

    NITDA picks 317 women for IgniteHER boot camp, targets startup funding

    November 24, 2026
    Popular Posts

    INEC deletes AI-faked voter photos, uncovers staff involvement in 10 states

    November 18, 2026

    Technology alone cannot build smart cities, says Agabi

    November 24, 2026

    Three big tests await Nvidia as Jensen Huang returns to leadership

    November 24, 2026
    © 2017 - 2026 Itpulse.
    • Terms & Conditions
    • Privacy Policy
    • Advertise
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.